The new George Pringle Secondary School in West Kelowna will accommodate 1,200 students and features enhanced school facilities with a theatre, dedicated Indigenous Spaces, three large shops, learning stairs and outdoor learning spaces, two full-sized fields, and a stand-alone childcare facility for up to 36 children.

Project Essentials

  • ClientThe Board of School Trustees – District 23 (Central Okanagan)
  • LocationWest Kelowna, BC
  • Architect(s)studioHuB architects + MQN Architects
  • Size11,900 sm

Utilizing efficiencies in a design-build environment, Fast + Epp worked closely with the contractor and architectural team to develop an efficient, quick-to-erect structural system that would also respond well to the sloping site, accommodate the Owner’s desired form and massing, and eliminate needless transfers and structural complexities

Inspired by lean construction techniques, the planned construction schedule and sequence informed our design focus on the parts of the structure that were to be constructed first, allowing for those to begin while design of other parts of the structure were still being completed, resulting in significant schedule savings.

Slated to open for the start of the school year in fall 2027, the building will be built with sustainable practices – utilizing a geo-exchange system for heating and cooling and an energy efficient design.