The City of Edmonton wanted a recreational facility within Coronation Park that, when paired with the adjacent aquatic centre, would allow for year-round indoor triathlons – a North American first. The building also contains gymnasium courts, a running track, and multi-purpose rooms for general fitness and wellness use. To further indoor continuity between the two buildings, an enclosed corridor to the aquatic centre was part of the buildings programming.
Project Essentials
- LocationEdmonton, AB
- ClientCity of Edmonton
- ArchitectDub Architects, HCMA Architecture + Design & FaulknerBrowns Architect
- Size182,986 ft² (17,000 m²)
- BudgetC$117 M