The Whistler Athlete High Performance Centre is an 18,000 sq. ft. building which includes classrooms, multi-purpose space, a gymnasium, and a sports medical office. The structure comprises a mixture of precast concrete insulated wall panels and custom curved steel and cable roof trusses. The building served as a training facility during the 2010 Winter Olympics.
Whistler, BC Hotson Bakker Boniface Haden Architects Photo credit: Stephan Pasche